The first installation in a series of joint effort projects between Iron Mountain and Aniron using the Power Purchasing Agreement (PPA) model. The main challenge with this installation was the grid operator’s maximum AC export capacity, however by oversizing the array it allowed the installation of a 525kWp system. As document and data centres there are detailed technical and security needs, Aniron’s Sesh Diu says “The SMA inverter specification exceeded Iron Mountain’s very specific technical requirements and the support we receive from SMA is why we hold SMA as our primary choice for inverters.”
Location
Birmingham
Commissioning
August 2019
Specific requirements
PPA, Oversized DC/AC ratio
Nominal power
525 kW
Annual energy yield
802 kWh/kWp (east/west system)
CO2 savings
estimated 249.5 tonnes annually
System Technology
6x Sunny Highpower PEAK1 (SHP-75) Inverters
IM-20
Sunny Portal
Fill the online form
If your reference is selected by SMA UK, it will be published on our website and shared through our social medias.
Questions? Speak to an SMA expert.
Contact us
Discover more references
View all